CAIRO, May 17 (MENA) – Prime Minister Mostafa Madbouli was briefed about the operation system of the Bus Rapid Transit (BRT) project.
The premier was briefed by Deputy Prime Minister for Industrial Development and Minister of Industry and Transport Kamel el Wazir during his tour to inspect the pilot operation of the first phase of the BRT project.
El Wazir explained details on linking the BRT stations with bus stops on the Ring Road as well as waiting areas for commuters and ways to get BRT tickets.
The minister pointed out that 100 air-conditioned electric buses will be operated in the first and second phases of the project. The 66-seat buses are set to serve 3,200 commuters per hour on both directions.
He added that the buses are locally manufactured under the directives of President Abdel Fattah El Sisi on localizing industries to contribute to changing Egypt into a regional industrial hub. (MENA)
K F E/M N E
OPEN// PM briefed about operation system of BRT
مصر/Cabinet/Egypt
You have unlimited quota for this service